Annex
Statement of changes (both in response to the views as officially changes) associated with the adoption of the integration plan Luchterduinen (Q10).
In previous papers related to this project indicates that the integration plan is established by the Ministers of Economic Affairs, Agriculture and Innovation (EL &!) and of Infrastructure and the Environment (I & M) and that the authorization procedure is coordinated by the Minister of Economic Affairs, Agriculture and Innovation (EL &!). At the inauguration of the new Cabinet press in October 2012, the name of the Ministry of Economic Affairs, Agriculture and Innovation (EL &!) Aligned.
Therefore, hereinafter reference to the Minister of Economic Affairs (EZ). If it is referred back to decisions of pros in October 2012, it will remain Minister of Economic Affairs, Agriculture and Innovation
(EL &!) Stand.
Rules
Article 1
Title of Article 1: 'The plan' was changed to 'In these rules ",
you are adapted to: the integration plan "by the Minister of Economic Affairs and the Minister of
Infrastructure and Environment;
i.2: EL ip12Luchterduin-2000 changes in EL ip12Luchterduin-3000;!
u4 'time of tervisielegging foundation of the draft plan" is changed to 'the time of the adoption of the integration plan.
"Article 3
1/3 ais hemummerd to 3.1,
3.1b is hemummerd to 3-4-la;
3.2.1 has been modified to: To build true that, notwithstanding the provisions of The destinations laid down should not be built in Article 3.1;
3.3 hemummerd to 3-4 · and added are 3.3 Deviating from the building
regulations, the competent authority may depart through an environmental permit from the provisions of 3.2 and allow the other previous next destination (s) buildings and structures, no buildings are being built, provided that:
a. Notwithstanding this authority is used locally by the term "specific form of drill pipe";
b. no disproportionate impairment occurs on the effective operation of the power lines referred to in Article 3.1;
c. advance is obtained written advice from the relevant lead manager.
3.3.1 hemummerd to 3-4-1: in the title added "location cable. The text has been amended to: The construction of the power lines as defined in 3.1 must meet the following contingent liability with respect to the location of cable and method of construction:
a. the heart of the cable should be at least three meters from the border destination;
b. "drilling specific type of tap 'at the site of the designation, the construction of the power lines should be obliged to find means of directional drilling location;
c. The cable should at a minimum depth to be located, with each area the following minimum depths apply:
i. Generally, a minimum depth of 1.2 meter, measured with respect to ground level;
2. Notwithstanding the provisions of subparagraph 1 is that the spot marked "specific form of leadership - drilling" a minimum depth of 4 m shall, measured from ground level;
3. Notwithstanding the provisions of subparagraph 1 to the spot marked "specific form of leadership - by crossing dunes' is a minimum depth of 9, 7 m true, measured relative to sea level;
4. Notwithstanding the provisions of subparagraph 2 and 3 applies to the site of the designation 'specific form of conduit entrance and / or exit point' that the depth should be at least 1.2 meters.
3.4.2 Contingent liability flora and fauna Simultaneously with the construction of the power lines as specified in 3.1 we must establish the following contingent liabilities in respect of flora and fauna :;
3.3.1 ais renumbered to a 3-4-2,
3.3.1 bis renumbered to 3-4-2 b;
3.3.1 renumbered to dis 3- 4 · 2 c has been modified herein 'planned entry and exit points open excavations "to" designate "specific form of conduit entrance and / or exit point" and in the immediate vicinity daaivan'
3.3.1 cis renumbered to 3-4-3 with the addition: Simultaneously with the construction of the power lines as defined in 3.1 must meet the following conditional commitment towards archeology :;
3.3.1.e. is renumbered to 3-4 · 1 b;
3.4 are renumbered to 3.5;
3.4.1 has been renumbered to 3.5.1: is modified herein "in Article 3.4.2" to "in Article 3.5.2",
3-4.2 renumbered to 3.5.2: is modified herein "in Article 3-4 · 1 'to' in Article 3.5.1 ';
3-4 · 3 renumbered to 3.5.3: is modified herein" in Article 3-4-1' to 'in Article 3.5.1.
Articles
in 5.1 "article 6.3" to "Articles 3.3 and 6.3",
in 5.2 "Article 3.4" to ". Article 3.5
Imagination
The imagination is an indication' specific form of leadership - in and / or exit point "is added, together with an indication 'specific form of leadership - dune crossing" to ensure the minimum depths per line section. The route is adjusted imagination 1 at the beach.
The name of the Ministry of Economic Affairs, Agriculture and Innovation has been changed to the Ministry of Economic Affairs. Added is the name of the Ministry of Infrastructure and the Environment.
Decision
In textual improvements have been made that decision. In addition, the following items are included:
• The new name of the Minister of Economic Affairs ";
• The name of the Ministry of Economic Affairs, Agriculture and Innovation is changed to the Ministry of Economic Affairs
• The views and amendments to the acts.
Explanation
The plan notes are textual improvements, the changes to the zoning map and the rules have their impact obtained in the plan notes Furthermore, the following issues are incorporated:..
• The new coalition agreement;
• The depth of the location of the drilled cable indicated in meters below sea level;
• An adaptation of the building regulations in the form of a derogation granted by an environmental permit;
• summary of the changes: "An extension of the notes in section 4.9